LRT Erbil (Iraq)
Web Gis Erbil Iraq
Assignment name: Gis Erbil | Name of Client: Italian private Firm |
country: Iraq | Duration: 8 month |
Start date (month/year): 2011 | Completion date (month/year): 2012 |
Narrative description of Project: The project was born as a support for the design of the Erbil LRT: 75 Km of tramway divided into four lines (Red, Green, Yellow, Blue).
After the collection of the data needed for the project, and various surveys of the city, it was created a WebGis system in wich were implemented the following layer:
In some places have been included photos that allow you to see, from the same point of view, the actual landscape or with the metro.
The database used for the application is Postgres, this choice allowed us to use the same database for both design and web viewing, offering the team updated data in real time.
|
|
Description of actual services provided by your staff within the assignment:
|
|
Links: |